Bald Mountain

The CVRD assumend repsonsibility for this system, in Electoral Area I, on October 1, 2010. It services 70 lots with a potential build-out of 354 single and multi-familly homes.

The water source consists of 3 groundwater wells. Water from the wells is pumped through a treatment system to a steel reservoir and distrbutes to the system via gravity.

Fee Structure
he user charge is $135.00 per 6-month billing period, or $20.25 per month with the 10% discount for prompt payment .

This system is metered and customers are charged by an inclined block rate structure, with a basic 6-month water allotment of 200 cubic metres.

Water Management Bylaw No. 3245

Annual Report